web analytics
Name
Description

Our client procured the services of petrochem specialists OUTCO to carry out major asphalt repair works to the existing and highly deteriorated HGV parking area of the service station at Easington East.

Large pot holes and surface de-lamination had occurred at the entrance to the hotel and restaurant causing potential tripping hazards and a greater possibility of damage to vehicles.

OUTCO is proud to assist and support our fantastic NHS, on behalf of our client CBRE, completing essential line marking works at The NEC, Birmingham.

OUTCO was approached by our client to complete resurfacing works to an existing BP Petrol Station in Bedford.

McArthurGlen approached OUTCO to complete a large-scale resurfacing and civil engineering project at their site in Ashford Kent. Ashford Designer Outlet is an architectural special, with the large 24,000m² car park in the centre of the egg-shaped structure offering 1090 parking spaces.

Our client approached OUTCO following severe dilapidation to the entranceway into the safari park and main car parks. Repairs were required to 39 areas, with a limited budget due to the parks closure, in line with COVID pandemic protocols, OUTCO maximised the repairs within the budget available.

OUTCO have completed works at Walthamstow services situated on the A406 North Circular in London. Following a site survey the project was awarded to OUTCO that included over 550m² resurfacing, concrete repairs to eight areas of the forecourt area, the installation of new F900 Fibrelite inspection covers and thermoplastic marking.

As surfacing specialists in the retail environment, OUTCO was approached by our client, one of the UK’s biggest property management companies, to complete construction, maintenance and repair works at the Two Rivers Shopping Centre in Staines. A busy car park that is open 24 hours a day, seven days a week reaching an average of 4,000 customers a day.